Canyon Creek Logo  Canyon Creek Homeowners Association
Skip Navigation Links.   Skip Navigation Links > Documents > Architectural Approval > Roof  

Roof Application Form

Updated 14MAY23

NOTE: Please refer to Rules & Regulations - Part 2: Architectural Procedures and Standards for complete information about architectural approval requirements, architectural and landscaping guidelines and standards, and the approval process.

BEFORE YOU FILL OUT THIS FORM, PLEASE READ THE ROOFING SECTION (3.54) of the Rules & Regulations - Part 2: Architectural Procedures and Standards for helpful hints, and to understand what is and is not acceptable to streamline approval.

While this page is on your screen, you can type into the fields, select checkboxes and radio buttons. Then print the pages for neighbor review and to be mailed and logged by Optimum Property Management who will then send the information for review by the Architectural Review Committee. Please include a manufacturer's brochure indicating roof material style and color.

NOTE: Asphalt composition shingles and metal sheeting/panels/tiles roofing materials are not permitted.

Your roofer may need to remove any skylights possibly causing debris to fall into your home. It is recommended that you cover the floor directly below your skylights for the duration of the project.

Name:   
Property Address:

Date:    Phone:   

Email:

Installation Date:   
Manufacturer:
Product Name:
  
Color:
Material: Concrete tile   Spanish tile   Slate   Wood shake  
Other:
Contractor company doing the installation:


Will you require a dumpster? Yes   No

NOTE: Dumpsters may only be placed in the driveway (preferred) or street immediately in front of the home where the work is being performed. To prevent damage to driveway or street, please request that wood boards be placed below wheels and other supports. If placed in the street, dumpsters must have reflectors or reflective tape to minimize night driving accidents. Closed storage containers must remain locked when not in use. Dumpsters must be removed within thirty (30) days of being delivered unless a written extension request is submitted to and approved by the property management company. Any damage to streets or other Common Area property as the result of your improvement will be repaired by the Association and charged to the homeowner.

Dumpster Delivery Date:      Dumpster Removal Date:

Will you require a porta-potty? Yes   No

NOTE: Portable sanitation facilities (portable toilets or "porta-potties") are generally discouraged as long as the Homeowner can make suitable arrangements with the contractor and workers. If the nature of the Improvement and situation dictates that a portable sanitation facility will be required, this fact and its proposed location should be noted on the appropriate Home Improvement Application. The portable sanitation facility should be located out of view from the Common Area if reasonable and practical. Otherwise, it must be placed in the driveway or other portion of the homeowner's property (preferred) or street immediately in front of the home where the work is being performed. Prior permission is required from the property management company if the portable sanitation facility is required to be placed on the street. The portable sanitation facility must be serviced for waste removal no less than two times per week and must remain locked when not in use. The portable sanitation facility must be removed within seven (7) days of the Improvement completion date.

Have permits been submitted? Yes   No      Have the permits been approved?  Yes   No   

NOTE: City building permits are required for room additions, structure changes, patio covers, roofing, solar, electrical and plumbing changes/additions, furnaces, air conditioning equipment, natural gas piping, pools, spas, outdoor built-in gas appliances (e.g., outdoor BBQ, firepits. pizza oven, etc.) and sinks, and other modifications. Additional information can be found at https://www.cityofirvine.org/work/codes-licenses-permits and from your contractor.


Additional Comments: 

Note: The Architectural Control Committee has a list of roof replacements in Canyon Creek. A copy is available for each application. Contact the Managing Agent for this list.

Submitter's Signature: _______________________________  Date: _________________


Neighbor Advisement (Adjacent Neighbors)

You must obtain the signatures of adjacent neighbors (owners, not tenants) showing that they have been made aware of the intended improvement. Neighbor comments and signatures indicate that they have been notified and do not imply approval, which can only be granted by the Architectural Control Committee (ACC). However, ACC may contact neighbors to evaluate their comments.

1st Neighbor (to the left of your home)

Name:      Address:

Comments:

Signature: _______________________________  Date: _________________


2nd Neighbor (to the right of your home)

Name:      Address:

Comments:

Signature: _______________________________  Date: _________________


3rd Neighbor (directly across the street or behind your home depending on who will see the changes)

Name:      Address:

Comments:

Signature: _______________________________  Date: _________________


At the current time, this form cannot be submitted electronically. Fill out the form online then use your browser's Print button to print this form. Complete and return this form along with any necessary plans to the Community Manager (do not submit it to an Architectural Committee member). Your submission will be logged and filed then distributed to the Architectural Control Committee for approval. When a decision has been rendered, the Managing Agent will send you a letter with the final decision within 30 days of original receipt of your application.


To be completed by Architectural Control Committee

Authorized to Proceed     Conditional Approval (see below)     Disapproved (see below) by the required majority of the Canyon Creek Architectural Control Committee.

Conditions of approval or reason for disapproval. Any variance to published architectural standards must be approved by the Board of Directors.

Authorized to Proceed     Conditional Approval     Disapproved

Signature: _________________________________      Date: ______________
                  Architectural Committee


Authorized to Proceed     Conditional Approval     Disapproved

Signature: _________________________________      Date: ______________
                  Architectural Committee


Authorized to Proceed     Conditional Approval     Disapproved

Signature: _________________________________      Date: ______________
                  Architectural Committee


Homeowner Agrees to Changes for Conditional Approval

If the Architectural Committee has indicated "Conditional Approval," I agree to implement the changes noted above.

Signature: _________________________________      Date: ______________
                  Homeowner



Notice of Completion

The ACC will complete and submit a Notice of Completion  within sixty (60) days of completing the Improvement.

Forms may be filled in online, but must be printed, mailed and logged by Optimum Property Management before they can be reviewed by the Architectural Review Committee. Do not send directly to the Architectural Control Committee.

Optimum Property Management
Canyon Creek Managing Agent
230 Commerce, Ste 250
Irvine, CA 92602